Seattle Public Schools

Wing Luke Elementary

3701 S Kenyon St.
Seattle, WA 98118
About Wing Luke
Main Office: 206-252-7630
Fax: 206-252-7631

Wing Luke School Profile

Attendance Area School Attendance Area Map

School Leadership and Board District

Community Partners at Wing Luke 永路小学的社区资源和项目


Continuous School Improvement Plan (C-SIP)

Wing Luke Elementary C-SIP

学校持续改善计划(C-SIP)是每所学校的行动计划 它确定了学校在当前和即将到来的学年计划重点关注的领域, the performance goals they want students to achieve, 以及学校计划如何合作实现这些目标.

这些计划会定期更新,以反映每所学校正在使用的策略. 这个文件也可以作为我们的标题I学校全校范围内的改进计划.


School and Building Reports

School Report

Wing Luke Elementary School Report

学校报告显示了一个学校学术发展的简要快照, student climate, accountability, family and staff engagement, and overall school performance. 学校报告由州公共教育监督办公室为该州的每个学校和地区制作,并在全年定期更新数据.

On state assessments, students who are expected to participate but do not, such as absences or opting out, are counted as non-proficient. 这可能会影响学校的整体水平评级.

Questions about school reports? Contact the Research and Evaluation Department research@qfyx100.com.

School Climate Surveys

Wing Luke Elementary School Climate Survey

学校气候调查用于改善学校水平, climate surveys are given to all staff, students, and families each year. The staff and student surveys are given to respective groups in person at schools; the family survey occurs in the spring.

Building History

Wing Luke Building History and Information

Asbestos Hazard Emergency Response Act (AHERA)

由于建筑物的年龄或以前的石棉减少项目, 永路小学大楼内并无已知含石棉建筑材料. 如发现任何可疑物质,请通知下列石棉指定人员.

As required under AHERA, 永路小学必须保持石棉管理计划(AMP),并将其存档在学校. AMP可在周一至周五的上课时间进行审查.

Wendy Couture
Environmental Health and Safety Manager
wjcouture@qfyx100.com
206-252-0528


Discipline Dashboard

As part of Seattle Excellence, Seattle Public Schools’ Strategic Plan, 该地区致力于中断不合比例的纪律做法. 支持这项工作,提高透明度和问责制, 该学区为每所学校创建并发布了面向公众的纪律指示板,并于11月1日发布, 2021.

纪律仪表板数据反映了当前学年,并将在整个学年每季度更新一次. 如有任何疑问或疑虑,请联系具体学校的学校领导.

Academic Year: Current academic school year.
Accessible/Default:点击这里切换到仪表板的可访问版本.
Actions by Month:按月份和开除类型划分的纪律处分次数.
Actions: Count of disciplinary actions for an exclusion type.
Attribute:学生属性(性别,种族/民族,所服务的特殊教育,504计划)
Days: Count of exclusion days for an exclusion type.
Days of Exclusion: Count of exclusion days.
Discipline Rate:至少有一次违纪事件的学生人数除以所有在校生人数.
E. Expulsions:学生属性的紧急开除次数.
Enrolled: Count of enrolled students.
Exclusion Actions:学生属性的排除操作计数.
Exclusion Days: Count of exclusion days for a student attribute.
Exclusion Type: Short-term suspension (SS), Long-term suspension (LS), Emergency expulsion (EE), In-school suspension (IS), Expulsion (EX), and Interim alternative education setting (IA).
Exclusionary Actions: Count of exclusionary actions.
Expulsions: Count of expulsions for a student attribute.
FERPA Compliance:家庭教育权利和隐私法合规. *
Incidents by Day of Week: Count of disciplinary actions by day of week.
Incidents by Grade: Count of disciplinary actions by grade.
Incidents by Hour: Count of disciplinary actions by hour.
Incidents by Exclusion Type:排除类型的纪律事件数.
Incidents by Student Attribute or Support Service: Count of disciplinary incidents. 有多少学生参与其中,事故就会被计算多少次.
Incidents per 100 Students:违纪事件数除以在校生数,再乘以100. 有多少学生参与其中,事故就会被计算多少次.
Rate: Discipline rate for an exclusion type.
School Name: School name.
Students:至少有一次违纪事件的学生人数.
Suspensions: Count of suspensions for a student attribute.
Weapons:涉及武器的纪律事件数目.

*请注意:当一个小组少于10名注册学生时, 至少两个最小组的所有值都将被抑制.

Wing Luke Levy Projects

BEX IV

Levy Approved: 2013

2013年,超过72%的西雅图选民通过了BEX IV资本税. 

Budget: $43.2 million

永路于1971年开业,有几个主要的系统和结构挑战. 该建筑将被拆除,取而代之的是新的小学建筑. 现有的永路小学将被一座新校舍所取代, 哪些是与学校社区密切合作设计的.

Read more about this project.

BEX II

Levy Approved: 2001

2001年,西雅图选民通过了价值3.98亿美元的“卓越建筑II”(BEX II),以取代即将到期的“卓越建筑I”资本税. 它为整个地区的学校翻新或新建提供了资金.

Project Description

便携式教室被一个新的教室和一个自助餐厅/礼堂所取代.

  • Building Size: 50,518 gross square feet
  • Capacity: 450 students (grades K-5)
  • Site Size: 6.4 acres
  • Total Cost: $6.4 million
  • Completion Date: June 2005
  • Architect: Architects BCRA Tsang
  • Contractor: Commercial Structures, Inc.

About BEX

卓越建筑(BEX)资本征费用于资助现代化或更换老旧建筑物的项目, fund technology for student learning, 处理整个地区的地震和安全问题以及主要的预防性维护需求.

BTA II

2004年,西雅图选民通过了BTA II资本税. 这项税收资助了该地区每所学校近700个设施改善项目和技术升级. 

  • 2011: Made exterior improvements and upgraded interior. Made upgrades to comply with ADA. 升级机械设备,提高能源利用效率.
  • 2006: Waterline replacement

BTA I

The $150 million Buildings, 科技及学术/体育(btai)集资在一九九八年二月获选民通过. BTA I在该市的每所学校资助了超过465个大小设施项目. The projects included safety and security upgrades, 更换屋顶和窗户,技术和运动场升级.

  • 2000: Reroofing, Technology

About BTA

The Buildings, 技术和学术(BTA)资本税支持该地区的长期计划,以升级和翻新老化的学校设施,并解决入学人数增长问题.

The BTA IV Capital Levy was approved by voters in 2016. 正规买足球的App将从2017年到2022年获得这些税收资金.

Enroll at Wing Luke